On the 2/07/10 I worked Felipe on 160m ,condx were very poor ..WE started calling about 0830z es about 0850 I started hearing "CW" ping's, this was just like on 6m when the band just starts to open, but with lots of QRN.. The signals then started to build up and readable increased to where we made the 2 way QSO at 0905z PY1NB sunrise was at this time, This is a Polar Cap path ,making the qso harder.. Tu Felipe for making this 2way qso.. |